FORGOT YOUR DETAILS?

Production Process

01

Project Management & Design

Depend on the local climate, building ground, application, and other conditions, our project manager will offer the basic sports building solution for your reference. And our technology will design the 2D rendering to show you the prototype of the tent arena.
02

Aluminum Alloy Frame Production

After the structure calculation from our experienced technicians, the basic frame will start to be produced. By the advanced CNC machine, the aluminum alloy frame will be cut and drilled in the high precision.
03

Polishing & Riveting

Our assembly workers polish the screw holes carefully and rivet by high-quality metal tube. Make sure the hole is smooth and perfect to fix the screw tightly.
04

PVC Membrane Cutting & Welding

The CNC machine also used for PVC fabric cutting by technology program. After that, the PVC fabric or transparent PVC window will be welded by the heat-pressure machine ( The temperature reaches to 517℃) tightly.
05

Package

Shelter has introduced the CNC aluminum alloy frame package machine to increase the production efficiency. The PVC membrane will be packed into the PVC bay from being scratched.
06

Delivery

For ensuring you will receive the tent product as soon as possible, we load the product within 24/h.
07

After-sale Service

Shelter also provide after-sale service to our clients including the installation guidance and component replacement.
TOP
Alert: You are not allowed to copy content or view source